Analyzer Deliverables

Unpacking the Analyzer

  1. Inspect the received shipping container for any damage.

  2. Unpack the container and account for each of the system components listed on the accompanying packing list.

  3. Visually inspect each component for damage.

NOTE: In the event of damage, notify the shipper and Teledyne LeCroy. Retain all shipping materials for shipper’s inspection.

Analyzer Deliverables

Deliverable

M1288

M648

T328

M328Q

M328

Analyzer (with packing list)

✔️

✔️

✔️

✔️

✔️

Quick Start Guide

✔️

✔️

✔️

✔️

✔️

USB A-B 3.0 cable, 1m

N/A

✔️

✔️

✔️

✔️

USB C-C 3.0 cable, 1m

✔️

N/A

N/A

N/A

N/A

Ethernet cable, 10 feet

✔️

✔️

✔️

✔️

✔️

2 QSFP-DD to QSFP-DD direct attach cables, 1m

✔️

N/A

N/A

N/A

N/A

2 QSFP-DD to X8 SFP cables, 1m

N/A

✔️

N/A

N/A

N/A

2 QSFP/(4)SFP+ cables, 100Gb 30AWG

N/A

✔️

✔️

✔️

N/A

2 SFP+ to SFP+ direct attach cables, 1m

N/A

✔️

N/A

N/A

N/A

2 SFP to SFP direct attach cables, 0.5m

N/A

✔️

N/A

N/A

N/A

2 QSPF to SFP+ psv 30AWG cables, 1m

N/A

N/A

N/A

N/A

✔️

Three-prong AC power cable

✔️

✔️

✔️

✔️

✔️

C13-C14 10A power cord, 2 meter

✔️

✔️

✔️

✔️

✔️

DB9 (male) to DB9 (female) extension cable, 6 feet

✔️

✔️

✔️

✔️

✔️

Rack Mount Installation Guide

Available

Available

Available

Available

Available

✔️ = Included; N/A = Not Applicable